News

Gold Room Equipment Supplied By Ansac

Four integral pieces of gold processing equipment for the Aurora Gold Project are being supplied by Ansac. Guyana Goldfields’ Aurora Gold project is an open-pit and future underground mine located in Guyana that is currently in the construction and development stage with full production scheduled to start by mid-2015 at which time it will have an annual gold production of nearly 200,000oz.

Ansac are manufacturing and supplying a HK Series Rotary Kiln for carbon regeneration, a JO Series Elution Heater for elution circuit temperature control, a CX Series Calcine Oven that will be used for post elution drying and the sturdy TA Series Tilting Head Furnace that will be used for gold smelting. Ansac will be working closely with OFI Electrical in the manufacture and thorough onsite testing of these pieces of equipment prior to shipping to ensure the highest quality is delivered to our client in Guyana.

Ansac Sales Manager, Sarel Van Der Walt, commented “To be involved in this milestone project in Guyana is a great experience and the fact that Guyana Goldfields have ordered these four integral pieces of equipment from us will make their ongoing plant maintenance much simpler as they will only have to contact our spares and service team service to look after it all”

For further information on these, or any of Ansac’s other products, please contact us on +61 8 9724 9000.